STRENGTHENIONG PARTICIPATORY ORGANZATION (SPO) REGIONAL CENTER QUETTA IN ASSOCIATION WITH METAMETA RESEARCH
ToRs for hiring of design Engineer for civil works at Bhag & Bala Nari Balochistan
Preamble
Strengthening Participatory Organization (SPO) is development sector private Company who is engaged in the field of Education, Health, Livelihoods and Irrigation Water Management. The company has received a small funding from RVO, a subsidiary organization of Ministry of Economic Affairs Government of Netherlands under the public and private partnership basis. Government of Balochistan through irrigation department. In this regards an MoU was signed in July 2020.
The project name is “New Water Rights in Basin Management” Exclusivity in Spate Irrigated areas of Pakistan. Part of the project is under implementation in Kacho area of District Dadu Sindh in association with Sindh Irrigation and Drainage authority and RDF.
The remaining part half of intended Funds are required to be spent on spate irrigation systems in Bhag Nari area (Bala Nari and Zerena Nari) in Tehsil Bhag, district Bolan Balochistan. This TORs only covers the preparation of PC-1 (BOQ) of civil works at various canals along the Nari River e.g. spending on improvement of at canals and at farm gate irrigation water delivery. The package of improvement includes improvement and rehabilitation of flood canals, drinking water ponds, at field inlet/outlet structures.
The scope of work is already identified through the local PMCs members from different canal who will be benefited from Nari River as per following detail:
Rehabilitation of Easter DIke Dool Wah 5000rft
Rehabilitation of Musa Wah at Haji Shahr 9000ft
Construction of New Pond/Village Protection of Tuk Village
Khuda Bakhsh Channel at Ghazi Barrage.
Construction of Dour (outfall/Breach)
Desilting of Musa Wah 9000rft
15 at field water management structures (in Brick Masonry)
Rehabilitation of 2 channels at Erri Ganda (8000rft)
Village Protection Bunds Rehanzai New
Village Protection Bund Salarabad
(Note: the scope of work may change while preparing PC-1 in line with the farmer approvals)
For the purpose an engineering firm/professionals services are required for quantity calculation necessary drawings, cost estimates and site plans in line with Balochistan Irrigation Department
Schedule Rates 2018. The incumbent is required to undertake the following task before the commencement of the work.
Task
Undertake field survey and measure the scope work at each canals and system given in serial number 1-10
Devise the cost estimate against each item/component
Time period for the task is 45 days from the date of signing of the mutual agreement after selection.
For the field surveys this office will provide close coordination of local farmers through their PMC /FO members. Estimated time for field data collection is about 15 days.
This office can also provide the transport while commuting from Bhag office to different sites.
Payments of fee
Payment for the task will be made in 3 installments of the agreed consultancy cost (i) 40% advance giving in writing (ii) second installment will be released once the draft PC-1 is finalized and 20% and final payment shall be made after submission of final PC-1 and relevant papers.
Legal deduction in term of taxes on the consultancy cost will be applicable and dedicated as per the rates fixed by the government of Balochistan or Federal Board of Revenue.